NarrowHighway

A card from a free library — ask anything, no account, works offline. Every card carries its source.

The concrete for a slab

engineering

A slab 5 m by 4 m and 10 cm deep needs exactly 2 cubic metres of concrete — length × width × depth, the estimate every pour begins with. Worked & sealed by the engine — V = 5·4·0.1 = 2 m³. [HOLDS; open the seal to re-check.]

source
The Works — worked & sealed ↗
card id
card_works_concrete
address
UNPLACED

related in the keeping ↗ · its seal ↗ · raw JSON ↗

adjoining cards

Is this card incomplete? Tell the library — it will call out for more ↗